久久青青草原一区二区_久久久免费观看视频_久久久久久久激情视频_亚洲激情在线观看_欧美三区不卡_亚洲图片欧美一区_91久久精品一区二区别_欧美日韩精品中文字幕_久久久水蜜桃av免费网站_亚洲一二三级电影_欧美午夜一区二区三区免费大片_日韩视频在线你懂得_亚洲日产国产精品_亚洲国产精品尤物yw在线观看_欧美精品免费播放_久久综合五月天婷婷伊人

How to solve the general problem of PVC pipe fitting injecti
欄目:Industry News 發布時間:2021-06-03 15:19
The injection temperature of PVC pipe fittings is generally around 170 C, and the injection pressure is generally 60~120 MPa. Others are determined by the structure and size of the pipe fittings. Controlling the melting temperature is the ke...
The injection temperature of PVC pipe fittings is generally around 170 °C, and the injection pressure is generally 60~120 MPa. Others are determined by the structure and size of the pipe fittings. Controlling the melting temperature is the key to injection molded PVC products.

Correct choice of injection molding machine

It is also important to choose the injection molding machine.
1. Select screw type injection molding machine, can not choose plunger type injection molding machine; screw type preplasticized raw material quality is better than plunger type plasticized raw material quality.

2. Prevent corrosion and aging of equipment;

3. Where it is in contact with PVC plastic, it may not cause sticking residue to the plasticized melt;

4. The indicators of the equipment temperature control system must be correct;

5. The screw length to diameter ratio is slightly smaller, and the head of the screw should have a pointed shape;
The screw compression ratio is between 2 and 2.5, and the three lengths can be set to 40%, 40%, and 20%, respectively;

6. Use a universal nozzle with an aperture, equipped with a device that heats the temperature;

7. Need to master the cleaning cartridge technology;

8. Observe the temperature rise at any time, and notice the temperature rise at any time during the heating process of the cylinder.

9. The maximum working pressure that can be generated when the hydraulic pump is not overloaded when the injection molding machine is working.

10. The ejector pin pushes the force of the top plate of the mold; when the plastic part is cooled, a large ejection force is required to release the mold, and the material with a larger shrinkage rate has a larger ejection force.

11. When stopping, first discharge all the materials in the barrel, and clean the barrel with PS or PE, or add special PVC parking material to stop the original RPVC of the barrel.

12. Immediately after shutdown, apply oil and rust on the cavity and runner surface of the mold.

PVC pipe fittings common problems and solutions

1. Injecting pipe fittings often have molds that cannot be filled during processing. When the injection molding machine is just starting to run, because the mold temperature is too low, the heat loss of the PVC molten material is large, and it is easy to cause solidification. The resistance of the cavity is large, and the material cannot fill the cavity. This phenomenon is normal, but it will disappear automatically after the temporary continuous injection of the digital model.

2. The cause of the sinking problem has something in common with the cause of insufficient injection, specifically:

A: The set injection pressure is low, and the injection pressure can be appropriately increased.

B: The set dwell time is not enough. The dwell time can be increased appropriately, and it is valid only before the gate freezes. Reducing the depth of the sink at the near gate requires more time.

C: The cooling time is set to be insufficient, and the cooling time can be appropriately increased.

D: The amount of the sol is insufficient, and the amount of the sol is appropriately increased.

E: The mold water is not uniform, the cooling circuit can be adjusted to make the mold parts cool evenly, the shrinkage of the far gate increases the mold temperature, and the shrinkage of the near gate reduces the mold temperature.

F: The mold casting system has a small structural size, which can increase the gate or increase the size of the main, minute and flow passage sections. The position of the gate should be close to where the shrinkage is likely to occur.

3. The difference in surface gloss of PVC injection molded products is largely related to the fluidity of PVC materials. Therefore, improving the fluidity of materials is an important measure to improve products. The specific performance is:

A: Due to the low temperature of the molten material, the fluidity of the material is poor, and the heating temperature of the material can be appropriately increased, especially the temperature at the nozzle.

B: The formula is unreasonable, so that the plasticization of the material can not be in place or the filler is too much. The formula should be adjusted, and the plasticizing quality and fluidity of the material should be improved by the reasonable cooperation of the processing aid, and the dosage of the filler should be controlled.

C: The mold is not cooled enough to improve the mold cooling effect.

D: The gate size is small or the cross section of the flow channel is too small, and the resistance is too large. The cross section of the flow channel can be appropriately increased, the gate is enlarged, and the resistance is reduced.

E: The content of moisture or other volatiles in the raw material is too high, and the raw materials can be sufficiently dried or the water or volatiles can be removed by the raw materials.

F: Poor exhaust, can add a vent or change the gate position.

4. The back pressure should be controlled at about 1Mpa. Excessive high back pressure will produce excessive shear force, which will cause the PVC to overheat and decompose. At the same time, multi-stage back pressure control should be adopted in the melting process. At the beginning, the effective length of the screw is long, and the back pressure should be low. As the effective length of the screw decreases, the back pressure should be appropriately increased to compensate for the heat loss. A short period before the return of the material, the back pressure should be reduced to prevent leakage. Excessive back pressure can cause the following:

A. The melt pressure at the front end of the barrel is too high, the material temperature is high, and the viscosity is lowered, which will reduce the plasticizing efficiency;

B. The screw is slow backwards, and the pre-plasticizing time is long, which will increase the cycle time, resulting in a decrease in production efficiency;

C. The nozzle leaks, which wastes the raw materials and causes the heating ring near the nozzle to burn out;

D. The mechanical wear of the pre-plasticizing mechanism and the screw barrel is increased.

The following problems occur when the back pressure is too low:

A. The screw retreats too fast, the density of the melt flowing into the front end of the barrel is small, and the air is trapped;

B. It will lead to poor plasticizing quality, unstable injection rubber, product weight and product size change;

C. The surface of the product may have undesirable phenomena such as shrinkage, air flower, cold streaks, uneven gloss;

D. The inside of the product is prone to bubbles, and the periphery of the product is easy to go through the glue.

5. The screw speed should vary depending on the diameter. Generally, the diameter is <60mm, the rotation speed is 50-70rpm; the diameter is >70mm, the rotation speed is 20-50rpm, to prevent the excessive shear force and PVC degradation.

6. In order to inject plastic into the cavity, each speed is uniform, and the general injection speed is controlled in multiple stages. The principle is slow start injection. As the forming area increases, the injection rate must be increased to avoid cracking and shrinkage. Until the mark, can not be injected too fast to prevent the surface of the product from being eroded.

7. The temperature of the barrel during the injection should be controlled between 170-190 °C. When the temperature of the barrel reaches the set temperature, the blower should be started to cool down. When the temperature is to be raised, the air blower should be stopped to prevent the PVC from overheating.

8. The phenomenon common in injection molded PVC pipe fittings during layer peeling is especially prone to thick products. This phenomenon is mostly caused by poor injection molding fluidity of the material. Therefore, only by using a reasonable formula to improve material flow properties, reduce material viscosity, reduce plasticizing temperature and gel time, can prevent delamination. The internal and external lubrication in the formulation should be relatively balanced, and the amount of filler and lubricant should not be too much. In addition, low process temperatures are also one of the reasons for product delamination. An increase in temperature, especially the nozzle temperature, is beneficial to improve this phenomenon.

9. Silver-silver or silver-colored on PVC-U injection molded products, which is also a common phenomenon in the production process, especially the processing of dark thick-walled pipe fittings, which is more prone to such problems. It is generally believed that this phenomenon is caused by moisture in the raw material. But there are actually other reasons that can cause this to happen. The holding time setting is too short; the setting time is too short; the molten material is not continuous in the cavity; the plastic temperature is too high or the back pressure is too high; improper plastic ingredients or uneven plastic particles may appear silver or silver Grain. Solution:

A. Strict plastic proportion formula, the mixture should be uniform in thickness;

B. Dry before plasticizing to avoid pollution;

C. Dry the mold surface moisture and dirt, and use the release agent reasonably;

D. Increase the mold temperature, increase the pressure and speed of the injection, extend the cooling time and the injection cycle;

E. Starting from the nozzle, reducing the temperature of the melt cylinder or reducing the screw speed, so that the back pressure of the screw is reduced;

10. Red or blue markings are prone to occur when injection molding white tube parts. The appearance of this phenomenon is also related to the gating system in the mold. The gate is a very important part of the mold. Since the gate is the gateway to the mold from the melt, the flow resistance is the highest and the temperature is highest. It is easy to cause discoloration on the surface of the product. Therefore, it must be considered in the gate design to reduce the resistance and temperature variation of the flow. This is why it should be followed in the casting design, the gate size should be large and should not be small, the gate flow path should be short and not suitable, and the thickness should not be thin. There is also a design industry for mold cold wells. In addition, the melt temperature is too high, the injection speed is too fast, and the mold is poorly ventilated, etc., which may also cause discoloration of the surface of the product, which can be solved by adjusting the process temperature and parameters.

11. The difficulty of demoulding has the reason of the mold, and there are also factors of improper process, but in most cases, the mold release mechanism is improperly caused. In the demolding mechanism, there is a hooking mechanism, which is responsible for hooking out the cold material at the main, branch and gate: the ejecting mechanism, using the ejector rod or the top plate to eject the product from the moving mold. If the draft angle is not enough, it will cause difficulty in demolding. There must be sufficient pneumatic pressure when pneumatically ejecting and demolding. Otherwise, it will also cause difficulty in demoulding. In addition, the core pulling device of the parting surface, the thread core removing device and the like are all important components in the demolding structure, and improper design may cause difficulty in demoulding. Therefore, in the mold design, the demolding mechanism is also a part that must be taken seriously. In terms of process control, over-temperature is too high, too much feed, excessive injection pressure, and too long cooling time can cause mold release difficulties. Mold:

A. The design has an unreasonable undercut, the demoulding structure is unreasonable or the position is improper, and needs to be corrected.

B. The mold is not enough in the mold to modify the mold and increase the angle.

C. The surface of the mold is scratched and scratched or the surface of the cavity is rough and needs to be polished.

D. The highly polished mold surface makes it difficult for the injection molded part to be molded under vacuum negative pressure.

E. The ejector mechanism is not appropriate and needs to be revised.

Injection molding process:

A. Too much injection, over-filling of the in-mold compound, reducing the amount of injection, injection pressure and injection speed.

B. The material temperature is too high and needs to be lowered.

C. The holding time is too long, reducing the screw forward time.

D. Increase cooling time or shorten cooling time.

E. Demold by means of a release agent, if permitted.

It can be seen that PVC pipe fittings will produce various problems during the processing, but all the problems are caused by equipment, process, mold, formula, etc. As long as there are perfect equipment and molds, reasonable formula and Process can avoid problems. In the actual production process, such problems are often generated, or problems are generated and the causes and solutions are not known. Therefore, rich operating experience is also a condition for ensuring perfect products.

Finally, the following requirements should be noted in the preparation of raw materials:

1. It is necessary to avoid the deterioration of PVC raw materials in other plastic PVC raw materials. Especially when injecting other raw materials, it is necessary to clean the plastic in the barrel and the screw before injecting the PVC product. (Clean the screw and barrel with PE\PP\PS material).

2. The PVC material must be completely cleaned before shutdown. If it is stopped for a long time, in order to prevent the PVC from corroding the machine, clean the screw and barrel with the cleaning material.

3. When the PVC material is placed for more than 6 months, and the environment is hot and humid, it can be used after drying for 2-5 hours at 60-80 °C before use.

Wuxi Jiahong Plastics Technology Co., Ltd. has nearly 30 years of experience in research and development and granulation of modified PVC pellets. The professional technical service team can provide one-stop system solutions for customers. For more information about the product, please visit our official website: m.218992.com, consult online customer service or call the hotline. Fixed line: 0510-68755207 Mobile: 15190220696, we will be happy to help you.

(Disclaimer: All the tutorials and resources included in this site are from the Internet, and the copyrights are owned by the original author and its website. Although this site strives to preserve the original copyright information, it may not be possible for certain reasons. For the true source, please forgive the original author! If you have any objection to the attribution of the tutorial and resources on this site, please notify Xiaobian immediately, the situation is true, we will delete it as soon as possible.)
久久青青草原一区二区_久久久免费观看视频_久久久久久久激情视频_亚洲激情在线观看_欧美三区不卡_亚洲图片欧美一区_91久久精品一区二区别_欧美日韩精品中文字幕_久久久水蜜桃av免费网站_亚洲一二三级电影_欧美午夜一区二区三区免费大片_日韩视频在线你懂得_亚洲日产国产精品_亚洲国产精品尤物yw在线观看_欧美精品免费播放_久久综合五月天婷婷伊人
免费视频最近日韩| 日韩欧美亚洲区| 国内精品露脸在线视频播放| 欧美日韩中文字幕在线| 亚洲一区在线观看免费| 中文字幕日韩欧美在线视频| 国产成人va亚洲电影| 一区二区国产在线| 91麻豆视频网站| 亚洲一区二区三区精品中文字幕| 日韩欧美成人一区二区三区| 91日韩欧美| 欧美日韩亚洲综合| 欧美日韩中文另类| 高清一区二区| 国产在线日韩精品| 欧美日韩激情一区二区三区| 欧美日韩在线国产| 一区二区在线视频播放| 日韩精品在线网站| 欧美日韩在线第一页| 欧美日韩国产第一页| 国产网站av| 日韩三级高清在线| 国产欧美日韩视频| 欧美日韩国产91| 欧美久久在线观看| 国产日产一区二区| 第一页在线观看| 欧美日韩中文字幕日韩欧美| 久久99久久99精品中文字幕| 国产中文在线播放| xxxcom在线观看| 在线观看一区| 日韩手机在线观看视频| 国产农村妇女精品一二区| 激情婷婷亚洲| 精品成人久久久| 影音先锋一区二区资源站| 精品不卡一区二区| 国产一级一片免费播放| 亚洲日产av中文字幕| 视频一区二区精品的福利| 中文官网资源新版中文第二页在线观看| 伊人伊成久久人综合网小说| 尤物在线精品| 欧美黄页在线免费观看| 1024国产在线| 午夜国产福利一区二区| 国产欧美日韩在线播放| 丰满少妇一区二区| 欧美色视频一区二区三区在线观看| 中文字幕日韩欧美在线| 日韩精品视频在线看| 日韩欧美国产成人一区二区| 久久精品网站免费观看| 亚洲小说春色综合另类网蜜桃| 久久精品在线免费观看| 一级特黄aaa大片在线观看| 国产不卡在线观看视频| 久久精品一二三| 天天综合天天| 亚洲视频在线观看三级| 在线观看中文字幕一区| 精品对白一区国产伦| 国产 中文 字幕 日韩 在线| www.中文字幕在线| 国产乱码在线| 不卡一区二区三区视频| 国产中文伊人| 国产在线中文字幕| 久久精品国产视频| 亚洲国产欧美久久| av高清一区| 欧美日韩中文字幕一区| 日韩亚洲国产欧美| 福利在线国产| 日韩欧美一二三| 日韩亚洲欧美中文字幕| 精品视频—区二区三区免费| 精品视频资源站| 精品日韩一区二区三区免费视频| 日韩手机在线观看视频| 欧美日韩视频免费看| 欧美日韩在线精品成人综合网| 日韩www在线| 欧美日韩亚州综合| 久久久精品国产99久久精品芒果| 日本精品在线中文字幕| 国产在线观看色| 日韩欧美中文字幕公布| 欧美日韩国产专区| 亚洲成av人片| 国产v日产∨综合v精品视频| 久本草在线中文字幕亚洲欧美| 日韩va亚洲va欧洲va国产| 国内精品不卡| 在线亚洲免费| 在线不卡日本| 91精品国产手机| 日韩欧美亚洲国产一区| 国产黄色一区| 欧美三级视频在线| 日韩av在线中文字幕| 91精品国产91久久久久青草| 国产区高清在线| 中文天堂在线一区| 国产区视频在线观看| 国产h片在线观看| 欧美中文字幕第一页| 久久精品欧美日韩精品| 国产第一页在线播放| 91精品视频免费在线观看| 免费看黄资源大全高清| 欧美一级久久| 91欧美日韩在线| 日韩亚洲国产欧美| 中文字幕在线视频第一页| 亚洲三级免费看| 国产在线观看色| 午夜福利一区二区三区| 国产福利在线播放| 欧美日韩夫妻久久| 久久精品视频免费看| 欧美日韩激情在线一区二区三区| 国产婷婷在线观看| 一级片免费在线播放| 午夜视频在线观看一区| 日韩欧美国产视频| 日韩精品综合在线| 中文字幕国产亚洲| 91久久中文| 日本亚洲欧美三级| 亚亚洲欧洲精品| 91精品国产91久久久久久三级| 97caopor国产在线视频| 深夜福利一区二区| 欧美亚洲国产日韩| 日韩.com| 亚洲综合在线中文字幕| 精品网站999www| 久久精品免费看| 99久久久精品免费观看国产| 国产黄色片中文字幕| 亚洲3区在线| 国产欧美亚洲一区| 99国产成 人 综合 亚洲欧美| 91精品婷婷国产综合久久竹菊| 91精品电影| 中文字幕欧美日韩在线| 欧美国产小视频| 亚洲成av人片在线| 欧美日韩中文字幕| 亚洲高清视频一区| 香蕉人人精品| 国产九九在线| 亚洲福利精品在线| 精品中文字幕视频| 九九视频精品免费| 91精品国产免费久久综合| 日韩免费视频一区二区视频在线观看| 日韩欧美在线视频| 麻豆一区二区99久久久久| 日韩在线中文字幕|